May 2023| Volume 02 | Issue 01 | Pages 12-20 


Future Energy 


Open Access Journal Journal homepage: https://fupubco.com/fuen 
ISSN 2832-0328 
Future Publishing LLC 


https://doi.org/10.55670/fpll.fuen.2.2.2 


Article 


A feasibility study and cost-benefit analysis of 
an off-grid hybrid system for a remote area 
electrification 


Upma Singh12*, Mohammad Rizwan! 


1Department of Electrical Engineering, Delhi Technological University, Delhi 110042, India 
?Department of Electronics and Communication Engineering, Maharaja Surajmal Institute of Technology, Delhi 110058, 


India 


ARTICLE INFO 


ABSTRACT 


Article history: 

Received 10 October 2022 
Received in revised form 

12 November 2022 
Accepted 22 November 2022 


Keywords: 

Renewable Energy, HOMER, Biogas, 

Solar Photovoltaic, 

Hybrid Renewable Energy Sources (HRES) 


*Corresponding author 


Email address: 
upma@msit.in 


DOI: 10.55670/fpll.fuen.2.2.2 


Off-grid power production utilizing renewable sources of power has become 
more significant and viable to meet the limited demands of remote locations. 
The primary goal of this study is to develop an economic and optimal hybrid 
PV/Biogas configuration for power production for rural common facilities, 
including one Primary school, Junior school, and Panchayat Ghar buildings of 
Sarai Jairam village in Uttar Pradesh, India. Data on the electric load was 
gathered for two schools and Panchayat Ghar. The PV/biogas hybrid 
configuration was designed utilizing the Hybrid Optimization Model for Electric 
Renewable (HOMER), and techno-economic analysis is carried out to fulfill the 
load requirements. The available biomass potential and the data on solar 
irradiance of the study area were utilized in the HOMER software to carry out 
the analysis. The HOMER analysis produced a solution that included total net 
present cost (NPC) and cost of electricity (COE), and these results were then 
further improved using sensitivity analysis. The sensitivity analysis employed 
sensitivity parameters like biomass potential, biomass pricing, solar irradiance, 
and variation in loads. Based on the NPC and COE, this analysis evaluates the 
system performance and demonstrates that it is techno-economically feasible. 


1. Introduction 


energy, and expanding the grid is not practical. Furthermore, 


The unavailability or shortage of electrical networks in 
remote locations, the excessive cost of grid extension, and the 
harsh topography frequently lead to exploring other 
alternatives. One of the most promising approaches to meet 
these areas’ need for electrification now involves standalone 
hybrid systems [1]. The grid-connected electricity for power 
delivery does not always benefit people. For instance, 
individuals who live in isolated villages, distant farms, and 
rural locations must rely on autonomous power supply 
systems that are based on the burning of fossil fuels [2]. The 
issue is that these systems increase greenhouse gas (GHG) 
emissions, which in turn lead to air pollution [3]. By utilizing 
renewable energy sources like solar, wind, biofuels, and 
others, GHG emissions may be decreased. Rural electrification 
is crucial to improving the economic and social conditions of 
rural residents and, eventually, to the development of the 
country [4-5]. The bulk of the population in India lives in 
isolated rural regions where they do not have access to grid 


those remote locations with grid connections only receive a 
restricted supply once every six to nine hours [6]. In addition, 
using a diesel generator to get an electric supply is not a 
practical alternative due to the expense of fuel, maintenance, 
and operation, as well as the emission of greenhouse gases, 
etc [7-8]. Additionally, the Government of India is working to 
promote renewable energy sources by offering various 
programs, incentives, etc. The Indian government has also set 
a target of increasing the amount of electricity produced by 
RES to 450 GW by 2022 [9]. Due to the stochastic nature of 
RES, a hybrid system that combines two or more sources is a 
more advantageous and sustainable alternative [10]. Utilizing 
a variety of simulation and optimization tools and 
approaches, a great deal of work has been done in this regard. 
Flavio Odoi- Yorke et al. examined the possibility of using a 
hybrid solar PV/biogas/battery energy system to provide 
power to distant areas in Ghana. The objective is to employ 
locally accessible renewable energy sources to reduce 


12 


U. Singh, M. Rizwan/Future Energy 


greenhouse gas emissions while achieving a Levelized Cost of 
Electricity (LCOE). The results show that in terms of cost and 
pollution savings, PV/biogas/battery systems outperform 
PV/diesel/battery and diesel-only systems [11]. Endeshaw 
Solomon Bayu et al. conducted a study to incorporate wind 
turbines, micro-hydro systems, solar photovoltaic (PV) 
systems, and battery systems to check the feasibility of hybrid 
systems to electrify the remote place [12]. Paul et al. 
examined the economic viability and feasibility of utilizing a 
hybrid-electricity system in rural areas. The findings show 
that, when compared to PV/Diesel Generator (DG)/B and 
isolated DG systems, the photovoltaic (PV)/battery (B) 
system based on renewable energy (RE) has the lowest net 
profit cost (NPC) and cost of energy (COE). Although the COE 
and NPC values of the diesel generator (DG) hybrid-electric 
system (HES) are lower than those of the PV/DG/B system, 
the DG system still emits the most substantial pollution [13]. 
Similarly, Nyagong Santino et al. evaluated the viability of a 
hybrid power system for a remote South Sudanese 
community without electricity access. Based on the 
community's energy requirements, average energy 
consumption profiles were created over the course of a year. 
The system was configured and optimized using the HOMER 
pro application, and based on the standalone mode of 
operation, six potential combinations were modeled and 
examined technically and economically. Due to the significant 
solar potential, the Battery/DG/PV system has the minimum 
Net Present Cost (NPC) and Cost of Energy (COE) and 
provides a 22.94% investment return [14]. 

For the Atacama Desert in Chile, Francisco et al. 
conducted a cost-benefit analysis of the TEG-HPV system 
under actual environmental and market circumstances. The 
economic, electrical, and thermal models of the TEG-HPV 
system are constructed and examined in MATLAB. With 
regard to system costs, energy losses, ordinal efficiencies of 
TEG and PV modules, and their contributions to the 
economical viability of TEG-HPV systems, five distinct cases 
are taken into consideration. Payback durations for every 
scenario are calculated at maximum and minimum PV 
temperatures for the Atacama Desert, taking into account the 
industrial and residential prices of electricity [15]. Laetitia et 
al. conducted a feasibility study with the goal of incorporating 
renewable energy sources into Popova Island's energy 
system. It takes an analytical strategy that entails using an 
energy systems model and the Monte Carlo method before 
assessing the financial results [16]. Ahmad et al. investigated 
the feasibility of meeting the load demand with the best 
system that produces the least amount of CO2 and net present 
cost (NPC) emissions. The modeling results demonstrate that 
the NPC of the proposed grid/PV system is more sufficient 
than other configurations at the present grid tariff, resulting 
in a renewable proportion of more than over 50%, a payback 
period of 17 years, and a 54.3% decrease in COz. The 
outcomes further demonstrate that the integration of a 62 kW 
PV array with the primary grid is the optimal configuration 
that results in a minimal COE of 0.0688 $/kWh and sale back 
power of 9.16% of Al Baha University's total electricity 
consumption [17]. Mohammad Amin et al. developed the best 
renewable energy system possible to power a small 
community using only renewable energy sources. Like many 
remote Iranian communities, this one experiences regular 


May 2023] Volume 02 | Issue 02| Pages 12-20 


power shortages. A hybrid stand-alone and on-grid 
renewable energy system using fuel cells, biogas generators, 
wind turbines, and photovoltaics is suggested. In addition to 
the fuel cells, batteries, a hydrogen tank, an electrolyzer or 
reformer, and other backup and storage components are 
employed. The major objective is to identify the best design 
that can fulfill the demand for power while being acceptable 
from an environmental and an economic standpoint. The 
findings demonstrate that the cheapest option is to use 
biogas, wind, and solar rather than adding a fuel cell to this 
design would raise prices by 33-37% while simultaneously 
increasing the scalability of the system [18]. It is clearly 
revealed from the literature that a hybrid energy system with 
a diesel engine has several benefits over one that is solely 
powered by a diesel engine, including a longer engine 
lifespan, lower O&M (Operation and Maintenance) costs, 
lower fuel consumption and less of an adverse impact on the 
environment. Such systems still depend on fossil fuel, which 
is unfriendly to the environment and necessitates logistical 
arrangements for delivering the fuel to the community, which 
is the problem with them. Local fuel availability is frequently 
poor because of expensive transit expenses and theft danger. 
The diesel engine may be totally replaced with a biogas engine 
to solve the aforementioned issues, and its fuel can be 
produced locally in a limited digester. Utilizing locally 
generated biogas from dung can resolve issues associated 
with diesel fuel. Furthermore, the literature survey also 
indicates that HRES is a more reliable and cost-effective 
source of power than conventional grid systems. 

Additionally, the aforesaid research mostly focused on 
household electrification of rural areas while ignoring the 
need for power for schools and panchayat ghar. To the 
author's knowledge, there is no thorough study on the 
techno-economic analysis of such HRES in using HOMER on 
the selected location. Also, the creation of such models relied 
on the use of solar and wind energy, and there are only a small 
number of studies in which biogas and biomass energy 
sources were regarded as important sources for generating 
electricity. In this regard, an HRE-based power producing 
system is suggested for supplying continuous electricity to 
two schools and Panchayat ghar, located in Sarai Jairam 
village, district Agra, Uttar Pradesh, India. As a consequence, 
the major goal of this study is to offer the most feasible and 
most optimized alternative for electrifying panchayat ghar 
and primary schools situated in distant areas without access 
to grid electricity. To create the HRES, local RES from the 
research region is employed. Data on electrical load, solar 
radiation and biogas were utilized to apply techno-economic 
analysis utilizing HOMER pro simulations based on 
sensitivity. The organizational structure of the paper is 
planned as follows. Section 2 discusses the method of 
modeling of hybrid systems. Section 3 describes the 
assessment of electrical load. Section 4 briefly explains the 
system design and its assessment. Section 5, contains results 
and discussion and Section 6 presents the conclusions. 


2. Method of Modeling Hybrid Systems 

For the design and construction of an optimum hybrid 
system for a rural region, a systematized modeling technique 
is an integral step since it ensures that the rural population 
has reliable, consistent and dependable access to electricity 


13 


U. Singh, M. Rizwan/Future Energy 


[19]. The HOMER pro software has been utilized as a tool to 
identify the set of optimum systems that meet the load 
demand under specific system restrictions and input 
assumptions [20]. HOMER pro is a distributed power 
optimization tool designed by the National Renewable Energy 
Laboratory in the United States [21]. Due to the uncertainties, 
a sensitivity analysis is conducted to investigate the influence 
of input assumptions on the optimization outcomes. Figure 1 
depicts the process and proposed framework for system 
modeling and analysis. In the current study, a modeling 
technique that is shown in the following sections includes a 
description of the selected location, an assessment of 
renewable energy sources’ potential, electrical load 
estimation, and system design and optimization procedure. 


Figure 1. Process and proposed framework for system 
modeling and analysis 


2.1 Location Description 

The site for this study was Sarai Jairam village in Uttar 
Pradesh, India. The abundance of renewable energy and the 
region's strategic significance was taken into consideration 
while choosing the location. The location is identified by the 
coordinates at the longitude of 780 10.7’E and latitude of 270 
20.2’N and time zone (GMT+05:30) from NASA 
meteorological data. Figure 2 shows the geographic view of 
the research location. 


UTTAR PRADESH > 
nem mae P 


Figure 2. The geographic view of the research location 


May 2023| Volume 02 | Issue 02| Pages 12-20 


2.2 Assessment of wind and solar resources potential at 

the selected site 

From NASA meteorological data, the solar and wind 
energy data for Sarai Jairam village have been extracted, and 
the data are shown in Table 1 with their latitude and 
longitude (270 20.2’N, 780 10.7’E), and time stamp 
(GMT+05:30). Figure 3 and Figure 4 provide graphical 
representations of the specifics of solar radiation throughout 
the course of the year and wind data over the same period. 
Table 1 provides data on the selected site's annual average 
daily radiation (kWh/m2/day), clearness index, and wind 
speed (m/s). 


Table 1. Average monthly daily radiation, clearness index, 
and wind speed 


Month Solar Energy (SE) Clearness Wind 

(kWh/m?/day) Index Speed 
(WS) 

(m/s) 

Jan 3.670 0.578 4.230 
Feb 4.690 0.623 4.690 
March 5.590 0.620 5.020 
April 6.080 0.589 5.100 
May 6.360 0.574 5.250 
June 6.010 0.531 5.180 
July 4.960 0.444 4.740 
Aug 4.540 0.430 4.410 
Sept 4.750 0.503 4.150 
Oct 4.730 0.595 3.450 
Nov 4.030 0.611 3.360 
Dec 3.490 0.585 3.700 

7 0.7 


e N w 


Daily solar radiation (kWh/m2/day) 
A 


6 0.6 
5 0.5 
0.4 
0.3 
0.2 
0.1 
0 0 


RY A` & N x 
& Ś w XS SS yw” & Š s $ 


E Solar Energy (SE) (kWh/m2/day) — Clearness Index 


Figure 3. Monthly average solar irradiance throughout the 


year 
& 


& oa 
& & ys SF SF F 


uw 


a 


N 


Average wind speed (m/s) 
w 


m 


o 
we 


Figure 4. Monthly average wind speed throughout the year 


14 


U. Singh, M. Rizwan/Future Energy 


2.3 Assessment of biomass energy resource potential at 

the selected location 

In Sarai Jairam village animal dung may be simply used 
to produce biogas through the digestion and combustion 
processes, respectively. Anaerobic digesters are used to treat 
the manure produced by cattle and produce power. The total 
dung produced annually from the community is calculated by 
equation (1); 


Mn = yy Njmj (1) 


Where Mn is the annual total amount of manure produced, Nj 
is the number of the selected group of animals, n is the overall 
number of cattle and mj shows manure produced per cattle 
[21]. 

Table 2 lists the number of animals and the availability of 
animal manure in the village of Sarai Jairam. The total amount 
of manure produced by all the animals is estimated to be 
6.425 tons/day, which may be used to produce 166667.76 
kWh of power annually. The total potential of biomass is 
shown in Figure 5. 


Table 2. Total amount of manure produced by all animals 


Description Number Dung Dung availability 
of (kg/day/cattle) (kg/day) 
animals 

Buffaloes 310 15 4650 

Cow 175 10 1750 

Goat 25 1 25 


nN WwW FB WU aA N 


Available biomass (ton/day) 


= 


o 
SS pr O K& 


WU 


eo S 
RX 
Figure 5. Technical potential of biomass (animal manure) 


3. Assessment of Electrical Load 

In this work, a hybrid system that employs energy from 
solar and biogas has been designed to meet the electrical 
demands of one Primary school, Junior school and Panchayat 
ghar. The panchayat ghar has two rooms with two fans and 
four tube lights. The primary school contains six rooms with 
twelve fans, twelve tube lights, two computers, and one 
submersible pump, while, five rooms, ten fans, ten tube lights, 
two computers, and one submersible pump make up the 
junior high school. Table 3 provides the quantity, power 
ratings, and power consumption for each load. Figure 6 
depicts the electricity load of the proposed region taking into 
account future expansion. The data has been gathered from 
the school and panchayat ghar employees. 


4. System Design and Assessment 

The system configuration shown in Figure 7 includes a 
PV panel, biogas engine generator, and battery storage with a 
bidirectional converter. An electric load and biogas generator 
are connected to the AC bus. The battery storage and PV 


May 2023| Volume 02 | Issue 02| Pages 12-20 


module are connected to the DC bus. Additionally, the 
converter is coupled with the AC and DC buses. Table 4 shows 
the technical specifications and capital costs of components. 


Table 3. Electricity load calculation for the selected 
communities 


S.no. 1 2 3 4 
Load Fan Tube | Computer | Water 
light pump 
Power rating (watts) 60 30 100 500 
Panchayat | No. in use 2 4 0 0 
ghar 
Utilization 10 10 0 0 
hours 
Primary No. in use 12 12 2 1 
school 
Utilization 8 8 8 1 
hours 
Junior No. in use 10 10 2 1 
school 
Utilization 8 8 8 1 
hours 
Total energy 11760 | 6480 3200 1000 
Consumed (Watt) 
Total load 22.440kWh 
Seasonal Profile 
3 
2 
z 
> 
1 
0 
fesse esr eared 
Figure 6. Monthly load profile during the whole year 
0 DC Bus AC Bus 
ttha : 
PV Array 
| Biogas Genset 
Power 
Coverter 
Battery 
AC Loads 
24.00 LWhid 
3.60 kW peak 


Figure 7. Configuration of off-grid hybrid PV-biogas system 


5. Results and Discussion 
5.1 System sensitivity analysis outcomes 

For technical and economical assessment purposes, the 
system must be designed with certain constraints or control 
variables that have an impact on the operating costs and 
output of the HRES system. Because the developed system is 
sustainable and the possibilities like the changes in solar 


15 


U. Singh, M. Rizwan/Future Energy 


radiations and biomass supply were taken into account for 
the sensitivity analysis. Since animal dung is a free source of 
biomass, hence, the biomass price was not considered in the 
system design. It enables planners and designers to select a 
very efficient and cost-effective method for the specified 
design parameters. To find out how variations in solar 
radiation and biomass supply might affect the system 
economy, both variables were varied. As the supplied 
biomass was 6.43 tonnes per day, it varied between 6.43-6.50 
tonnes per day for the sensitivity analysis, and the solar 
radiation varied between 4.91-4.99 kWh/m2/day. 


Table 4. Technical specifications and cost of components 


Hybrid Specifications Value 
system 
components 
Solar PV Capital cost 650$/kW 
O&M cost 1$/kW 
Replacement 0$/kW 
cost 
Sizes 0,1,1.5,2,2.5,3,3.5,4,4.5,5,6,7, 
7.5,8,9,10 
Tracking system No 
Ground 20% 
reflectance 
Derating factor 80% 
Life span 25 years 
Azimuth,Slope 0 
Converter Capital cost 190$/kW 
Replacement 190$/kW 
cost 
Sizes 0,1,1.5,2,2.5,3,3.5,4,4.5,5 
Rectifier 85% 
efficiency 
Capaicity 100% 
relative to 
inverter 
Inverter 95% 
efficiency 
Life span 20 years 
Annual rate of 0% 
interest 
Battery Capital cost 150$/kW 
Replacement 30$/kW 
cost 
Nominal 1kWh 
capacity 
Float life 5 years 
Round trip 80% 
efficiency 
Mninmum state 40% 
of charge 
Lifetime 917kWh 
throughput 
Biogas Capital cost 250$/kW 
generator O&M cost 0.08$/kW 
Sizes 0, 1, 1.5, 2, 2.5, 3, 3.5, 4, 4.5, 5 
Replacement 150$/kW 
cost 
Biomass cost $3.75/tone 
Lowest load 30% 
ratio 
Life span 20000 hours 


May 2023] Volume 02 | Issue 02| Pages 12-20 


The sensitivity analysis outcomes of the HRE system are 
displayed in Table 5, which highlights how changes in the 
supply of biomass and solar radiation affect the NPC, COE, and 
operating costs. The findings reveal that as biomass is 
increased and solar radiation changes are taken into account, 
net present and operating costs also rise. 


5.2 System optimization outcomes 

The developed hybrid Photovoltaic/biogas system with 
sensitivity inputs was modeled in HOMER Pro software by 
ranging the potential of the biogas generator and solar 
radiance in order to determine the most efficient, optimized, 
and cost-effective system for the Primary school, Junior 
school, and Panchayat ghar in rural areas. To maximize the 
system's ability to meet the electricity demand, the capacity 
range of the biomass generator varied between 1kW to 5 kW, 
while the capacity range of the PV system varied between 
4kW to 6 kW. In this study, a 1.50 kW biogas generator, a 5 
kW PV array, a 3.25 kW converter, and 30 storage batteries 
were the optimal and most economically viable 
configurations evaluated for the hybrid system. This 
configuration is depicted in Figure 9. 
The developed hybrid Photovoltaic/biogas system with 
sensitivity inputs was modeled in HOMER Pro software by 
ranging the potential of the biogas generator and solar 
radiance in order to determine the most efficient, optimized, 
and cost-effective system for the Primary school, Junior 
school, and Panchayat ghar in rural areas. To maximize the 
system's ability to meet the electricity demand, the capacity 
range of the biomass generator varied between 1kW to 5 kW, 
while the capacity range of the PV system varied between 
4kW to 6 kW. In this study, an 1.50 kW biogas generator, 5 kW 
PV array, a 3.25 kW converter and 30 storage batteries were 
the optimal and most economically viable configurations 
evaluated for the hybrid system. This configuration is 
depicted in Fig. 9. As NPC, COE, and beginning capital 
investment are used to sort HOMER's optimum results. The 
total capital cost, NPC and COE for the best optimized PV- 
Biogas configuration are, respectively $8,743, $57,283, and 
$0.614. Other designs with varying equipment sizing that can 
meet the same energy load have low initial capital costs but 
high NPC, COE, and operating costs over the lifetime of the 
project. The various system designs with their significant 
economic parameters are shown in Table 6. 
Table 7 also depicts the share of power production of each 
component throughout a year, total electricity production, 
renewable percentage, and excess electricity with unmet load 
for all different system designs. Figure 8 depicts the average 
monthly electricity production from a hybrid PV-Biogas 
system, where orange bars show the power supplied by the 
photovoltaic panel and green bars show the power generated 
by a biogas generator. The total initial cost is calculated at 
$8,743 as shown in Table 6. This is the first investment 
needed to start the project. The initial cost of Lead acid 
battery and photovoltaic panels are more as compared to 
other components as shown in Figure 9. This higher cost is a 
result of the substantial battery storage capacity, which is 
intended to offer reliable electricity dispatch when the 
electricity produced by the power systems is not enough to 
fulfill the load. 


16 


U. Singh, M. Rizwan/Future Energy 


Table 5 Sensitivity outcomes for the hybrid PV/biogas system 


May 2023] Volume 02 | Issue 02/ Pages 12-20 


Sensitivity Architecture Cost 

Solar Scaled Bioma PV Bio 1kWh_ Converter NPC ($) COE ($) Operating cost Initial capital ($) 
Average ss (kW) (kW) LA (kW) ($/yr) 
(kWh/mA?/day) Scaled 

Averag 

e (t/d) 
4.91 6.43 5 1.5 30 3.25 57283 0.614 4547 8743 
4.92 6.44 5 1.5 32 3.25 56901 0.610 4483 9043 
4.95 6.46 5 1.5 32 3.25 55964 0.600 4396 9043 
4.97 6.48 5 1.5 32 3.26 55345 0.594 4337 9044 
4.99 6.5 5 1.5 32 3.25 54762 0.587 4283 9043 

Table 6 Various different optimized system configurations with economic parameters. 
Various Configuration NPC ($) COE ($) Operating Cost ($) Initial Cost ($) 
PV/Biogas/Battery/Converter 57283 0.6145 4547 8743 
PV/Biogas/Converter 169188 1.8107 15458 4178 
Biogas/Battery/Converter 213798 2.3475 19884 1539 
Biogas 260688 2.8009 24362 625 
Table 7 Electricity generation of different feasible system designs 
Parameters PV/Biogas/Battery/ PV/Biogas/ Biogas/Battery/ Biogas 
Converter Converter Converter 

PV array (kWh/year) 7,868 (81.1%) 7,868 (56.2%) 2 = 


Biogas generator (kKWh/year) 1,830 (18.9%) 6,128 (43.8%) 


9,013 (100%) 10,185 (100%) 


Total electricity generation 9,698 (100%) 13,996 (100%) 9,013 (100%) 10,185 (100%) 
(kWh/year) 
Renewable fraction (%) 100 100 100 0 


Capacity shortage (kKWh/year) 0.212 (0%) 143 (1.63%) 


2.11 (0.1%) 111 (1.27%) 


Excess electricity (kKWh/year) 65.0 (0.67%) 5,055 (36.1%) 0 1,466 (14.4%) 
Unmet electric load 0.0000267 (0%) 6.77 (0.0773%) 1.10 (0%) 41.0 (0.468%) 
(kWh/year) 
Monthly average electricity production 
mpv 1 
meio 23 
7 
= 05 
= 04 
0.3 
0.2 
0.1 
0 
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 


Figure 8. Monthly average electricity generation from the hybrid system 


17 


U. Singh, M. Rizwan/Future Energy 


4500 
— 4000 
2 3500 
H 3000 
(5} 
E 2500 
% 2000 
vo 
È 1500 
© 1000 
z 
500 q 
0 
Capital O&M Replacement Salvage 
Category 


m Generic 1kWh Lead Acid m Generic Biogas Genset (size-your-own) 


Generic flat plate PV E System Converter 


Figure 9. Cost summary of the hybrid PV/Biogas system 


In addition, the photovoltaic panels, which are less 
expensive once installed than a biogas generator, as biomass 
is available for free, which is why the fuel category has not 
been presented. Figure 10 displays the power generated by 
each component, and the total electrical load served is 
represented in the above plot, while the lower plot shows the 
unmet electrical load, total renewable power output, ac 
primary load served, input power, and state of charge of 
battery over the course of July 9 to July 18 to help with a better 
understanding of how the system operates. 

Table 8 and Figure 8 make it clear that the photovoltaic 
system consistently outperforms biogas in terms of electricity 
production. Being off the grid, the system uses solar and 
biogas as resources to meet the load demands because our 
maximum demand hours are during the daytime for 
community load (schools and panchayat ghar) purposes. The 
capacity factor of the PV modules is about 81.1%, and it 
operates throughout the year depending on load 
requirements, producing about 7,868 kWh/year, compared to 
1,830 kWh/year from the biomass generator having a 
capacity factor of 18.9%. Due to the lack of biomass 
availability throughout the day, biogas power generation is 
reduced. Furthermore, the system is producing more power 
than it needs to satisfy its annual power usage of 8,733 kWh, 
which can be saved or used for other productive purposes. 


6. Conclusion 

This study offers a technical and economical assessment 
of different stand-alone solutions for Primary school, Junior 
school, and Panchayat Ghar buildings of Sarai Jairam village 
in Uttar Pradesh, India. HOMER pro analyzed several hybrid 
PV-biogas system configurations by modeling a dynamic 
hybrid model. An ideal solution was suggested based on the 
cost analysis after these hybrid designs underwent sensitivity 
analysis using variables such as solar radiation, biomass 
resource, and system sizing. In this study, the combination of 
a 1.50 kW biogas generator, 5 kW PV array, a 3.25 kW 
converter, and 30 storage batteries was found to be the most 
cost-effective option with a total capital cost of $8,743, Net 
Present Cost (NPC) of $57,283 and Cost of Energy (COE) 
$0.61, respectively. This hybrid renewable energy system 
produces roughly 9,698 kWh per year, with an additional 965 
kWh per year being generated to make the study area grid- 
independent. Additionally, the system has an estimated 
payback period of 0.41 years and a favorable net current cost 
for a projection timeframe of 25 years. By providing rural 
areas with these hybrid renewable energy systems, the Indian 


May 2023] Volume 02 | Issue 02| Pages 12-20 


government may significantly contribute to resolving the 
country's current energy crisis. Additionally, the existing 
legislation that supports the use of such systems only offers 
tax breaks or reductions, which is insufficient to allow low- 
income populations to make use of these systems. The 
government may alter its supporting policies, offer rewards 
for system employment, and launch a national electrification 
campaign. Similar studies could be undertaken for other rural 
places in order to electrify them, which would also help the 
Indian government achieve its goal of "Power to all." 


Table 8. Annual generation and consumption of electricity by 
a hybrid system 


Generation | kWh/year | % Consumption | kWh/year | % 
PV 7,868 81.1 | AC primary | 8,733 100 
Modules load 

Biogas 1,830 18.9 | DC primary | 0 0 
Generator load 

Total 9,698 100 | Total 8,733 100 


Ethical issue 

The authors are aware of and comply with best practices in 
publication ethics, specifically with regard to authorship 
(avoidance of guest authorship), dual submission, 
manipulation of figures, competing interests, and compliance 
with policies on research ethics. The authors adhere to 
publication requirements that the submitted work is original 
and has not been published elsewhere. 


Data availability statement 

Datasets analyzed during the current study are available and 
can be given following a reasonable request from the 
corresponding author. 


Conflict of interest 
The authors declare no potential conflict of interest. 


Author contributions 

Mohammad Rizwan: Conceptualization and supervised the 
research; Upma Singh: Methodology; resources; validation; 
formal analysis; writing the original draft. Both authors 
contributed to the analysis of the findings, critically reviewed 
and edited the manuscript, and approved the final version for 
submission. 


Funding 
No specific grant has been given to this research by any 
funding agency/organizations. 


18 


U. Singh, M. Rizwan/Future Energy May 2023] Volume 02 | Issue 02| Pages 12-20 


[Generic flat plate PV Power Output 

EAC Primary Load Served 

H Generic Biogas Genset (size-your-own) Pow 
Wotsi Electrical Load Served 

Hurmet Electrical Load 

Dior Renewable Power Output 

E Generic 1KWh Lead Acid Input Power 

H Generic 1KWh Lead Acid State of Charge 


kw 


lt ry 
Lur Jy 
KIN 
KAA 
Yat py 
4at 75 
“ut Jy 
KIN 


Generic 1kWh Lead Acid State of Charge (%) 


“ut 75 
KA 
Ari 
4 7, 
KA 
KIN 


iS = 
> > 
x y 


Figure 10. Total electrical load served, unmet electrical load, total renewable power output, state of charge of the battery, ac 
primary load served and generated power by each component during July 9 to July 18. 


References 

[1] K. Kusakana, J. L. Munda, and A. A. Jimoh, Feasibility [7] S. Iqbal, M. U. Jan, A. U. Rehman, A. Shafiq, H. U. 
study of a hybrid PV-micro hydro system for rural Rehman, and M. Aurangzeb, Feasibility Study and 
electrification, In AFRICON 2009, IEEE, Sep. 2009, pp. Deployment of Solar Photovoltaic System to Enhance 
1-5. Energy Economics of King Abdullah Campus University 

[2] F. Rinaldi, F. Moghaddampoor, B. Najafi, and R. of Azad Jammu and Kashmir Muzaffarabad, AJK 
Marchesi, Economic feasibility analysis and Pakistan, IEEE Access, 10, 2022, pp.5440-5455. 
optimization of hybrid renewable energy systems for [8] Q. Ma, X. Huang, F. Wang, C. Xu, R. Babaei, and H. 
rural electrification in Peru, Clean technologies and Ahmadian, Optimal sizing and feasibility analysis of 
environmental policy, 23(3), 2021, pp.731-748 grid-isolated renewable hybrid microgrids: Effects of 

[3] J. Ahmed, K. Harijan, P. H. Shaikh, and A. A. Lashari, energy management controllers, Energy, 240, 2022, 
A.A., Techno-economic feasibility analysis of an off- p.122503. 
grid hybrid renewable energy system for rural [9] F. Eze, J. Ogola, R. Kivindu, M. Egbo, and C. Obi, 
electrification, Journal of Electrical and Electronic Technical and economic feasibility assessment of 
Engineering, 9(1), 2021, pp.7. hybrid renewable energy system at Kenyan 

[4] A.K. Awopone, A.K., Feasibility analysis of off-grid institutional building: A case study, Sustainable Energy 
hybrid energy system for rural electrification in Technologies and Assessments, 51, 2022, pp.101939. 
Northern Ghana, Cogent Engineering, 8(1), 2021, [10] M. M. Seedahmed, M. A. Ramli, H. R. Bouchekara, M. S. 
pp.1981523. Shahriar, A. H. Milyani, and M. Rawa, A techno- 

[5] F. Rashid, M. E. Hoque, M. Aziz, T. N. Sakib, M. T. Islam, economic analysis of a hybrid energy system for the 
and R. M. Robin, Investigation of optimal hybrid energy electrification of a remote cluster in western Saudi 
systems using available energy sources in a rural area Arabia, Alexandria Engineering Journal, 61(7), 2022, 
of Bangladesh, Energies, 14(18), 2021, p.5794. pp.5183-5202. 

[6] A.H. Eisapour, K. Jafarpur, and E. Farjah, Feasibility [11] F. Odoi-Yorke, S. Abaase, M. Zebilila, and L. Atepor, L., 
study of a smart hybrid renewable energy system to Feasibility analysis of solar PV/biogas hybrid energy 
supply the electricity and heat demand of Eram system for rural electrification in Ghana, Cogent 
Campus, Shiraz University; simulation, optimization, Engineering, 9(1), 2022, pp. 2034376. 
and sensitivity analysis, Energy Conversion and [12] E.S. Bayu, B. Khan, I. G. Hagos, O. P. Mahela, and J. M. 
Management, 248, 2021, pp.114779. Guerrero, Feasibility Analysis and Development of 


Stand-Alone Hybrid Power Generation System for 
Remote Areas: A Case Study of Ethiopian Rural Area, 
Wind, 2(1), 2022, pp.68-86. 


19 


U. Singh, M. Rizwan/Future Energy 


[13] 


[14] 


[15] 


[16] 


[18] 


P. C. Okonkwo, E. M. Barhoumi, W. Emori, M. I. 
Shammas, P. C. Uzoma, A. M. Amer Mohamed, and A. M. 
Abdullah, Economic evaluation of hybrid electrical 
systems for rural electrification: A case study of a rural 
community in Nigeria, International Journal of Green 
Energy, 19(10), 2022, pp.1059-1071. 

N. S. D. Ladu, R. Samikannu, K. G. Gebreslassie, M. 
Sankoh, L.E. R Hakim, A. Badawi, and T. P..B Latio, 
T.P.B., Feasibility study of a standalone hybrid energy 
system to supply electricity to a rural community in 
South Sudan, Scientific African, 16, 2022, p.e01157. 

F. J. Montero, R. Kumar, R. Lamba, R. A. Escobar, M. 
Vashishtha, S. Upadhyaya, and A. M. Guzmán, Hybrid 
photovoltaic-thermoelectric system: Economic 
feasibility analysis in the Atacama Desert, Chile, 
Energy, 239, 2022, p.122058. 

L. Uwineza, H. G. Kim, and C. K. Kim, Feasibility study 
of integrating the renewable energy system in Popova 
Island using the Monte Carlo model and HOMER, 
Energy Strategy Reviews, 33, 2021, p.100607. 

A. Tazay, Techno-economic feasibility analysis ofa 
hybrid renewable energy supply options for university 
buildings in Saudi Arabia, Open Engineering, 11(1), 
2021, pp.39-55. 

M. A. V. Rad, R. Ghasempour, P. Rahdan, S. Mousavi, 
and M. Arastounia, Techno-economic analysis of a 
hybrid power system based on the cost-effective 
hydrogen production method for rural electrification, a 
case study in Iran. Energy, 190, 2020, p.116421. 


[19] 


[20] 


[21] 


[22] 


20 


May 2023] Volume 02 | Issue 02| Pages 12-20 


O. Babatunde, I. Denwigwe, O. Oyebode, D. Ighravwe, A. 
Ohiaeri, and D. Babatunde, Assessing the use of hybrid 
renewable energy system with battery storage for 
power generation in a University in Nigeria, 
Environmental Science and Pollution Research, 29(3), 
2022, pp.4291-4310. 

L. Ji, Z. Liu, Y. Wu, and G. Huang, Techno-economic 
feasibility analysis of optimally sized a 
biomass/PV/DG hybrid system under different 
operation modes in the remote area, Sustainable 
Energy Technologies and Assessments, 52, 2022, 
p.102117. 

D. T. Hermann, N. Donatien, T. K. F. Armel, and T. René, 
Techno-economic and environmental feasibility study 
with demand-side management of 
photovoltaic/wind/hydroelectricity/battery/diesel: A 
case study in Sub-Saharan Africa, Energy Conversion 
and Management, 258, 2022, p.115494. 

A. Shiroudi, S. R. H. Taklimi, S. A. Mousavifar, and P. 
Taghipour, Stand-alone PV-hydrogen energy system in 
Taleghan-Iran using HOMER software: optimization 
and techno-economic analysis, Environment, 
development and sustainability, 15(5), 2013, pp.1389- 
1402.